1. Application Description 1) Service Description The base station commissioning indicates that the users commission and verify the base. OptiX RTN Radio Transmission System. VRC Commissioning and Configuration Guide (Web LCT). Issue, Date, HUAWEI. Huawei DBS Commissioning Procedure Security Level: Huawei DBS Commissioning Procedure (V) HUAWEI Confidential Page1.

Author: Faelkree Nemuro
Country: Tunisia
Language: English (Spanish)
Genre: Environment
Published (Last): 8 September 2015
Pages: 28
PDF File Size: 5.80 Mb
ePub File Size: 5.77 Mb
ISBN: 848-9-75185-116-3
Downloads: 26076
Price: Free* [*Free Regsitration Required]
Uploader: Maurg

Skip to main content. Log In Sign Up. Scope The scope of this document is to give a detail procedure hyawei the commissioning of the Huawei DBS base station. The document will provide the required tools, contacts and procedures to huuawei followed. Site Awareness There are a number of site in Canada that are in remote location that require situational awareness therefore when travelling to and from remote site locations it is important that the engineer is equipped for travel to remote sites Engineers must huaeei be aware that Tower work takes precedent over any other site work; therefore if tower work is in progress then the tower crew is in control of the site.

If required the engineer may have to remain off site until tower crews have finished any ongoing operations. If tower work is in progress then hard hats are required to be worn onsite.

Clmmissioning following section will provide a breakdown of the activities required for successful commissioning of the base station. This report then provides the basis for scheduling activities for commissioning preparation and commissioning activities.

From this report a forecasting schedule will then be produced to initiate the site configuration data to be prepared and the scheduling of engineers to attend site for commissioning. The huawdi of this process are not covered in this document and is only included for informational purposes. Commissioning Preparation In order for commissioning preparation to be considered complete the following must have happened.

Sub-contractor team got the correct NodeB software and Script from Huawei. Sub-contractor team got the special USB memory stick with LED available and kept the NodeB software and script with the correct name, file format in the correct path as following: A valid Huawei ID card will be required for all engineers attending site.

Site Access Procedures On attending site the engineer will be required to follow the site access procedures laid out below. This procedure must happen all the time, every time. Site Installation Checks Before the engineer begins the commissioning of the base station they will be required to carry out an audit of the installation quality.

  ISO 22323 PDF

Please refer to the document: If the USB Memory stick is detected correctly the following should happen within 20 seconds: Once the downloading of the software and commissioninb to the DBS begins the following should be occurring: It will take about 10 minutes to activate the software.

The DBS will carry out a reset after the software and the data configuration has been activated. The full reset will take about 5 minutes. After the reset is complete, DBS runs normally, the status should now be: Huaaei laptop and NodeB with a Fast Ethernet cable. Set the IP address for laptop.

Micro Base Station Commissioning Guide

You need set IP Address is Click the […] button on the Office row. Click Add and Fill the table. Input the User Name: Once you are logged in successfully you should see the following. Then double-click Software Update. Once this is all complete click [Next]. Then double-click Software Update, as before. The Upgrade NodeB software dialog box will not be displayed. After the upgrade the software is complete, system will automatically reset NodeB, this will take about 5 minutes.

Then double-click Data Config File Transfer. The following dialog box will then be displayed. Use the [Browse] button to set the location of the configuration file NodeBCfg. Once the NodeB has reset the new configuration will take effect. Please wait minutes. If the some of the commands failed, please call RNC Engineer for troubleshooting. To finalize the commissioning of the NodeB and make it ready for call testing it is necessary to notify the RNC engineer that the software upgrade and the commissioning is complete.

The RNC engineer will need to unlock the cells and load the appropriate license keys for the NodeB configuration.

RTN VRC01 Commissioning and Configuration Guide 02(Web LCT) – Huawei

The following section describes the checks required. If commissioninng is not the right version, please do Item 10 Local Commissioning again. This file will become part of the site documentation package. The engineer will need to resolve or account for any active alarms on the NodeB with the assistance of the RNC engineers and Huawei technical support.

  APERGHIS RECITATIONS PDF

If the RNC engineer is not able to provide the necessary support the local engineer will need to contact Huawei technical support. To do this the engineer will need to us a compass to find orientate the direction of hyawei sectors and then verify the Cell ID and scrambling codes for each antenna.

The diagram below details the orientation of the Antennas, the first sector Alpha is the one orientating to the north east, alone the clockwise, are the second Commissipning and the third Gamma sector. Alpha Gamma N Beta Once the cell orientation has been verified then call testing can begin.

Micro Base Station Commissioning Guide-Wireless Network Info Community-Huawei Connect

Telus has some special sites, which are not defined like this, Huawei will provide a list of these kind of sites Call P Testing After you finish the call test, please call RNC Engineer to unblock commissikning and block cells, you can make calls and Handover After you finish the callp, please call RNC Engineer to unblock all cells and tell them the Callp on site finished.

Call tests should consist of the following: Call RNC Engineer to block all cells. Then make Voice call and video call in each cell. Make sure the PSC is right in each cell. Make a call and walk around the site, to make sure there is no call drop.

Then make Voice call and video call in each cells. Make a PS download and walk around the site, to make sure there is no call drop. Initiate the internet connection and make sure connection is set up. Login to site http: Check the download speed 4. And then you can get the values in this XLS file. Save it and send all these three bfs to Huawei.

RTN 950 V100R003C01 Commissioning and Configuration Guide 02(Web LCT)

Compiling and Submitting the Site Documents Testing will differ slightly between S and S sites due to the different in cells present on the site. Remember me on this computer. Enter the email address you signed up with and we’ll email you a reset link. Click here to sign up. Help Center Find new research papers in: